Power Electronics Development Center

cancel
Showing results for 
Search instead for 
Did you mean: 

Case Study: E-Power Swiss 500 kW Solar Inverters - One Year Development Cycle for Design, Prototyping, Certification, Manufacturing, and Commercial Deployment

In this case study presentation from NIDays Switzerland 2014, learn how E-Power Swiss AG designed a 500 kW PV inverter, set up a factory in China, built prototypes, passed certifications, commissioned first units, and began commercial production all within one year using the NI CompactRIO and LabVIEW toolchain.

Please download the attached presentation PDF (screenshots below are highlights only).

EPS Tianjin - Intro to One Year Cycle.png

EPS Tianjin - One Year Development Cycle.png

EPS Tianjin - Serial Production & Remote Monitoring.png

EPS Tianjin - HW and SW Tools.png

EPS Tianjin - System Overview.png

EPS Tianjin - Project Leader

EPS Tianjin - 2 Years Out - Hundreds of Deployed Units.png

EPS Tianjin - Capabilities and Services.png

Contact Information:

E-Power Swiss AG

Wilenstrasse 28

CH-8832 Wilen b. Wollerau

Email: d.maier@e-power-swiss.ch

Phone: 0041 78 697 8068

0 Kudos
Message 1 of 2
(6,161 Views)

This is an excellent presentation and congratulations to the EPS team for this substantial achievement!

A few questions come to mind:

1. What was the hardware platform that they ended up using for the commercial product? Was it a sbRIO/GPIC based solution or was it a cRIO platform as implied in the presentation. Any chance they can share which cRIO or sbRIO model was utilized?

2. Two very interesting slides were the System Overview slides, pages 14 and 15. At what rate were they able to run Vdc control loops on the RT? Also, is there a sample NI code that utilizes the DMA and interrupt style programming? 

0 Kudos
Message 2 of 2
(5,040 Views)