NI TestStand

cancel
Showing results for 
Search instead for 
Did you mean: 

period limit test

Hi,

 

is it possible to do a Limit test within a period of time?

Normally a Limit test decides if it´s passed or failed with one measurement. I want to capping a longer period of time (if in this period of time is the Limit test passed or failed always)

 

For any questions I am to you gladly at the disposal.

 

 

Kind Regards,

Andi

0 Kudos
Message 1 of 4
(2,308 Views)

Hello AndreasP92

 

should this test done in parallel, so that the rest of the application runs?
Can i get some more informations wjat exactly should done?
A simple way was to loop this step or to place it in a while loop with timing.

best regards
Alexander
0 Kudos
Message 2 of 4
(2,279 Views)

Hi,

 

no, it is a sequentiell sequence.

 

I had the same idea with the Loop. But when I use the Loop I have a lot of measurements and a lot of results in the Report, isn´t it?

 

An Example:

After a undefined time (the time varies) I have a stable process (attachment).

I want to check the value of the y-axis from the time when the value of the y-axis doesn´t change. When the value of the y-axis doesn´t change for 15 minutes, the test is ok. When the value of the y-axis changes the test isn´t ok.

1. I Need the time when the stable process starts

2. I Need one result in the Report that Shows that the value of the y-axis is stable within the 15 minutes.

 

Do you understand my Problem?

 

Thanks,

Andreas

0 Kudos
Message 3 of 4
(2,256 Views)

Hello AndreasP92,

 

a simple schort idea for this

 

 

Unbenannt.PNG

 

Disable recording for the while loop and look after the loop, if it reaches the loop iteration count or not additional you can insert the result of the last measurement in the report or the time how long it runs without a fail.

0 Kudos
Message 4 of 4
(2,252 Views)